Guide

Preliminary tests on scaffold ties, and using more anchors

In short

A TG4:25 preliminary test loads 5 anchors in each base material to 2 × the tie duty (3 × for nylon), away from where the scaffold will be tied. If all 5 hold without slipping 1 mm, the anchor can be used. If any fails, an engineer reviews the options, which include using more anchors at a lower allowable load.

This guide explains how site tests are planned and carried out under BS 8539:2012+A1:2021 and NASC TG4:25. It does not replace those documents, the anchor manufacturer's data, or the instructions of the scaffold designer, specifier or engineer responsible for the job, who decides the test plan, the loads and the factors. A test records what happened on the day; it does not approve a fixing for use.

Key figures

Anchors tested5 in each base material on the project
Test load2 × the tie duty; 3 × for nylon anchors
PassAll 5 hold the test load without slipping 1 mm or more
Stopping point in tests to failure1 mm of slip
Allowable tie load after a failureLower of average failure load ÷ 3 and lowest failure load ÷ 2
Allowable tie load, nylon anchorsLower of average failure load ÷ 5 and lowest failure load ÷ 3
Anchors neededOriginal number × tie duty ÷ allowable load

When are preliminary tests needed on scaffold ties?

Run preliminary tests whenever the maker's data can't show that the anchor will carry the tie duty in the wall you are fixing to. On scaffolds that mostly means brick, stone and timber with no published figures for that material, and any case where you would otherwise be leaning on a concrete rating: masonry, old concrete, or concrete with cracks (NASC TG4:25 §6.2 and §9.1).

Five anchors taken to a set load show whether there is a safe margin, without breaking anything.

How is a preliminary test on scaffold ties done?

  1. Plan the sample

    Use 5 anchors for each different base material on the project.

  2. Install away from the scaffold

    Set the test anchors well clear of where the scaffold will be tied, fitted the same way the working anchors will be.

  3. Work out the test load

    2 × the tie duty, or 3 × for nylon anchors. Some manufacturers state that creep is not significant for their PA6 and PA66 nylon anchors; then use 2 ×. See working out the tie load.

  4. Load in tension

    Apply the load directly to the anchor, with the rig feet off the brick or block the anchor is in.

  5. Check for slip

    An anchor passes if it holds the test load without slipping 1 mm or more.

  6. Discard the test anchors

    Once the tests are finished, the test anchors are discarded. They are never used to tie the scaffold.

  7. Record the results

    Record each anchor's location, the test load and the result. See what goes in a site test report.

What happens when all 5 anchors pass?

If none of the 5 slipped as much as 1 mm at the test load, you can use that anchor in that base material at the planned tie duty. Every job still needs proof tests on the installed anchors. See proof testing scaffold ties.

What are the options if an anchor fails?

When any test anchor falls short, the results go to an engineer, who chooses one of three routes (TG4:25 §9.3 lists them in full):

  • Change the anchor: go deeper, go bigger in diameter, or switch to another type. A new anchor means a fresh set of 5 preliminary tests.
  • Lower the load: pick a scaffold arrangement with a lighter tie duty, for example by swapping sheeting for netting, taking off cladding or adding ties; the TG20 and TG30 eGuides model this. Or have the scaffold redesigned.
  • Share the load: keep the anchor but use more of them, as worked out below.

How do I work out how many more anchors are needed?

The number needed is the original number × tie duty ÷ allowable tie load, rounded up; the allowable tie load comes from loading the 5 test anchors to failure.

  1. Take each of the 5 test anchors to failure, carefully, stopping when it has slipped 1 mm so the wall is not damaged; that load counts as its failure load.
  2. Allowable tie load: the smaller of (average failure load ÷ 3) and (lowest failure load ÷ 2).
  3. Nylon anchors use ÷ 5 and ÷ 3 instead, unless the maker says creep is not significant for its PA6 or PA66 anchor, in which case ÷ 3 and ÷ 2 apply.
  4. Anchors needed: original number × tie duty ÷ allowable tie load, rounded up.

TG4:25's divisors are for scaffold anchors only.

Worked example: one anchor fails

A scaffold design gives a tie duty of 4.8 kN, so the preliminary test load is 9.6 kN. Four anchors hold it, but one slips 1 mm at 9.1 kN. The engineer chooses to use more anchors. The 5 anchors are then loaded to failure, stopping at 1 mm of slip: 9.1, 11.4, 10.6, 12.0 and 10.2 kN.

  • Average failure load: 53.3 ÷ 5 = 10.66 kN. Divided by 3: 3.553 kN.
  • Lowest failure load: 9.1 kN. Divided by 2: 4.55 kN.
  • Allowable tie load: the lower value, 3.553 kN.
  • The design had 30 anchors: 30 × 4.8 ÷ 3.553 = 40.5, so 41 anchors are needed.

One way to add anchors without adding ties is to fix each tie with two anchors, such as a plate held by two screws.

How far apart should two anchors on one tie be?

Two anchors on one tie should be spaced as the manufacturer recommends. TG4:25's welded-plate detail uses two hex-bolt screws 150 mm apart vertically in 75 mm brick courses, which keeps one clear course of bricks between them. Without the maker's guidance, TG4:25 §8.4 rules out two anchors in one brick and, where you can, in bricks next to each other. See scaffold anchor types.

How does this differ from a BS 8539 preliminary test?

A BS 8539:2012+A1:2021 preliminary test uses different factors. Its test load is NEk × νtest ÷ (αdist × Ω), where νtest for short-term loading such as scaffold anchoring is 2 in concrete, 3 in masonry and 3.5 for nylon. After a failure, its divisors also depend on the base material: 3 and 2 in concrete, 4 and 3 in masonry, 5 and 3.5 for nylon, again with α_dist and Ω. Under BS 8539, the "more anchors" route should only be considered when the failure was close to the test load, for example above 0.8 × the test load.

Follow TG4:25 for scaffold ties unless the job specification calls up BS 8539. The scaffold designer or responsible engineer decides. See preliminary tests and our test-load calculator.

More questions

Sources

  1. NASC TG4:25 Anchorage systems for scaffolding, Sections 9.1 to 9.4, NASC
  2. BS 8539:2012+A1:2021 Code of practice for the selection and installation of post-installed anchors in concrete and masonry, Annex B.2.3.1, BSI

Testers for scaffold ties

The Staht t25 reaches 25 kN, enough for preliminary tests on every tie class with non-nylon anchors.