In short
The tie duty is the working load from the TG20 or TG30 compliance sheet or the scaffold design. Under NASC TG4:25, proof test at 1.25 × the tie duty and preliminary test at 2 × the tie duty, or 3 × for nylon anchors. For a 6.1 kN standard-duty tie, that is 7.625 kN, 12.2 kN and 18.3 kN.
This guide explains how site tests are planned and carried out under BS 8539:2012+A1:2021 and NASC TG4:25. It does not replace those documents, the anchor manufacturer's data, or the instructions of the scaffold designer, specifier or engineer responsible for the job, who decides the test plan, the loads and the factors. A test records what happened on the day; it does not approve a fixing for use.
Key figures
| Proof test load | 1.25 × the tie duty |
|---|---|
| Preliminary test load | 2 × the tie duty |
| Preliminary test load, nylon anchors | 3 × the tie duty, unless the maker states creep is not significant for its PA6 or PA66 anchor |
| Working load limit | The tie duty must not exceed the anchor's recommended or allowable load |
| Combined tension and shear | N_app ÷ N_rec + V_app ÷ V_rec ≤ 1.2 |
Where does the tie duty come from?
The tie duty comes from the TG20 or TG30 compliance sheet that covers the scaffold, or from the scaffold designer's drawing for a bespoke design. It is the working load in tension that each tie must carry.
TG20 and TG30 base their tie patterns on three tie classes, by working load in pure tension: light duty at 3.5 kN, standard duty at 6.1 kN and heavy duty at 12.2 kN. NASC TG4:25 also lists a standard-duty tie at 9.1 kN, for Class B couplers. A design may give a different figure.
How does the tie duty compare with the anchor's rating?
Pass if the tie duty is no more than the anchor's recommended load (maker's data) or allowable load (preliminary tests). If it is more, scale up the anchors: the number planned × tie duty ÷ rating, rounded up. That can mean more ties, or two anchors on each tie, such as a plate with two screws (TG4:25 §5.1).
The recommended load is already the maker's safe working figure, so the check is simply tie duty ≤ recommended or allowable load. Do not round the tie duty down.
How do I work out the test loads?
Multiply the tie duty by the factor for the test: 1.25 for a proof test, 2 for a preliminary test, or 3 for a preliminary test on nylon anchors. Work from the exact tie duty for your scaffold, not a rounded figure.
Worked case 1: a 6.1 kN standard-duty tie.
- Proof test: 1.25 × 6.1 = 7.625 kN.
- Preliminary test, non-nylon anchor: 2 × 6.1 = 12.2 kN.
- Preliminary test, nylon anchor: 3 × 6.1 = 18.3 kN.
Worked case 2: a bespoke tie duty of 4.8 kN, from a design drawing, for anchors in brickwork.
- Preliminary test, non-nylon anchor: 2 × 4.8 = 9.6 kN, on 5 anchors.
- Preliminary test, nylon anchor: 3 × 4.8 = 14.4 kN.
- Proof test: 1.25 × 4.8 = 6.0 kN, on at least 5% of the anchors.
TG4:25 Appendix A tabulates the loads for all four standard tie classes. For jobs specified to BS 8539 instead, our test-load calculator works out the preliminary test load.
How does TG4:25 round proof loads?
TG4:25 gives its proof loads to one decimal place, and not always upwards: for a 6.1 kN tie, 1.25 × 6.1 = 7.625 kN, which TG4:25's table lists as 7.6 kN. Which figure to test to is for the specifier to decide.
Which tester covers which tie test?
By capacity, a 25 kN tester such as the Staht t25 covers proof tests on all four standard tie classes, the highest being 1.25 × 12.2 = 15.25 kN. The light-duty proof load, 4.375 kN, is 17.5% of 25 kN, so check on the tester's calibration certificate that its accuracy at that load meets the 5% TG4:25 asks for. It also covers preliminary tests on non-nylon anchors up to heavy-duty ties, at 2 × 12.2 = 24.4 kN. Preliminary tests on nylon anchors for 9.1 kN and 12.2 kN ties need 27.3 kN and 36.6 kN, so they need a tester such as the 60 kN Staht t60.
Which way do the loads act on a tie anchor?
Wind pushes and pulls the scaffold at right angles to the building, so the main load on a tie anchor runs along the tie. The other directions are normally taken by something else, and the table shows what to do if they reach the anchor (TG4:25 §5.4 to §5.7).
Loads on a tie anchor
| Load | Normally taken by | If it reaches the anchor |
|---|---|---|
| Pull (away from the wall) | The anchor, in tension | This is the tie duty: check it against the anchor's rating |
| Push (towards the wall) | Transoms or props butted against the wall | Ask the maker whether the anchor takes compression, and what wall thickness it needs behind it |
| Sideways (along the wall) | Butting or bracing against the building | Arrange it to arrive as shear, never bending |
| Vertical (scaffolds carried by the building, or roofs that wind can lift) | Nothing on an independent scaffold: its weight goes to the ground | Arrange it to arrive as shear |
Can the tie itself be the weak link?
Yes. If structural fittings form part of the tie, the tie can only carry the safe working load of those fittings, whatever the anchor can hold.
How do I check combined tension and shear?
Where an anchor carries tension and shear together, check the two together, not just each on its own. One check that NASC TG4:25 shows is:
Napp ÷ Nrec + Vapp ÷ Vrec ≤ 1.2
where Napp and Vapp are the working tension and shear loads, and Nrec and Vrec the recommended tension and shear loads. Combine shear from sideways and vertical loads into one resultant first. Ask the anchor manufacturer for the check that applies to its anchor. See shear testing.
What if the specification calls up BS 8539 instead?
If a job specification calls up BS 8539:2012+A1:2021 rather than TG4:25, use its factors. For short-term loading such as scaffold anchoring, BS 8539's preliminary test factor νtest is 2 in concrete, 3 in masonry and 3.5 for nylon anchors, and the test load is also divided by αdist and Ω. In masonry, this gives a higher test load than TG4:25's 2 × the tie duty. The scaffold designer or responsible engineer decides which applies. See preliminary tests.
More questions
1.25 × 6.1 kN = 7.625 kN. NASC TG4:25's table lists it as 7.6 kN.
2 × 12.2 kN = 24.4 kN for most anchors, or 3 × 12.2 kN = 36.6 kN for nylon anchors, unless the manufacturer states that creep is not significant for its PA6 or PA66 nylon anchor.
Because nylon creeps: held under load for a long time, it slowly deforms, so an anchor that survives the test load for a short time can still fail at a lower load in service. The higher test load allows for this, unless the manufacturer states creep is not significant.
The TG20 or TG30 compliance sheet for the scaffold, or the scaffold designer for a bespoke design. The tester tests to the load worked out from it and records the result. The report records what happened and does not approve the anchor.
By capacity, a 25 kN tester covers proof tests on all four standard tie classes, once its accuracy at the light-duty load is checked as above, and most preliminary tests. Preliminary tests on nylon anchors for 9.1 kN or 12.2 kN ties need more than 25 kN.
Sources
- NASC TG4:25 Anchorage systems for scaffolding, Sections 5 and 9 and Appendix A, NASC
- NASC TG20 A comprehensive guide to good practice for tube and fitting scaffolding, NASC
- NASC TG30 A comprehensive guide to good practice for system scaffolding, NASC
- BS 8539:2012+A1:2021 Code of practice for the selection and installation of post-installed anchors in concrete and masonry, Annex B, BSI
Testing scaffold tie anchors
Staht's t25 and t60 cover scaffold tie tests up to 25 kN and 60 kN. For preliminary tests on jobs specified to BS 8539, use our test-load calculator.