Guide

Anchor point inspection in Europe and Brazil

A tester in a safety helmet and high-visibility vest using a Staht t25 on an anchor in a stone pier on a roof

In short

Permanent anchor points for fall protection are inspected after they are installed and then at regular intervals by a competent person, following the maker's instructions, and each inspection is recorded. In practice the interval is usually no more than 12 months, but where that comes from differs. German DGUV guidance recommends no more than 12 months; in France, the national insurer's recommendation R 430 asks for a yearly check of fixed anchors (removable anchors, as PPE, must by law have been checked in the 12 months before use); Brazil's NR 35 sets a periodic inspection at no more than 12 months; Dutch and Italian law set no interval. A load (pull) test is part of an inspection only where a rule, the system's designer or the anchor's maker asks for one, at the load they set.

This page explains how anchors, eyebolts and anchor points are commonly tested, inspected and recorded. It does not replace the law, the standards it names, the manufacturer's instructions, or the decisions of the person responsible for the job or the system, who sets the tests, the loads and the inspection regime. A test records what happened on the day; it does not approve an anchor for use.

The rules at a glance

CountryMain rule or guidanceHow oftenWho inspectsLoad test
UKWork at Height Regulations 2005, regulation 12; BS 7883:2019 (code of practice)After installation, then at suitable intervals and after anything that could affect safetyA competent personWhere the designer or the examination scheme asks, at their load
GermanyDGUV Information 201-056 (2025) and DGUV Regel 112-198 (2019): guidance from the accident insurersNo more than 12 months recommendedA competent person (Sachkundiger); for anchors fitted from 2016, suitably qualified staff, to the maker's instructionsNot asked for: a shake test by hand, and the fixing opened up if in doubt. Load tests only to the makers' method and load
FranceCode du travail R4323-99 to R4323-101 with the arrêté of 19 March 1993 (fall-arrest PPE); CNAM recommendation R 430 (fixed anchors)PPE: checked in the 12 months before use. Fixed anchors: a visual check every year (R 430)PPE: a qualified person (personne qualifiée). Fixed anchors: a competent person (personne compétente), according to INRS ED 828R 430: 500 daN (5 kN) for 15 seconds at installation in masonry, then in a multi-year plan
NetherlandsArbobesluit article 7.4a (inspection of work equipment), as Dutch inspection bodies apply itAfter installation, then as often as needed; no interval in months (the yearly inspection firms offer follows EN 365 and makers)An expert (deskundige)Where necessary (zo nodig beproefd)
ItalyD.Lgs. 81/2008 (articles 77 and 115); regional rules for roofs, such as Tuscany 75/R and Piedmont 6/R; UNI 11560:2022Set by the maker's manual and the system's maintenance programmeNot set nationally: the maker's manual and the installer's maintenance programmeNo test load in the official texts we read
BrazilNR 35, Annex II (anchorage systems); NR 18, item 18.12.12 (building anchors for façade work)Initial inspection, then periodic inspection at no more than 12 monthsNot named. Trained workers install; the operating procedure, which covers inspection, is written by a professional qualified in occupational safety; a permanent system's project and installation are under a legally qualified professionalNR 35: only for an existing anchor whose markings are lost. NR 18: tests to national standards or the maker

Inspection, load test and certification: what is the difference?

  • Inspection is the check a competent person makes against the system's documents and its maker's instructions: that the anchor is the one recorded, correctly fitted, undamaged, not corroded or deformed, and that its fixing is sound. Every rule below asks for one.
  • A load test (a proof test or pull test) applies a measured force, held for a set time, to show the anchor and its fixing hold it. It is part of the inspection only where a rule, the designer or the maker asks for it, at the load and hold time they give.
  • Certification is not a word most of these rules use. What they ask for is a record of each inspection, kept with the system's documents.

A load test shows the anchor held that load on the day. It doesn't show the anchor or the system meets its design: that comes from the design, the maker's instructions and the inspection.

EN 795, EN 17235 and EN 365

  • EN 795:2012 covers anchor devices for one user that can be removed from the structure. It is still the current edition; a revision, for temporary anchor devices only, is at the final draft stage.
  • Fixed anchors are not PPE in the EU. In 2015 the European Commission decided (Implementing Decision (EU) 2015/2181) that only EN 795's types B and E, mobile anchors not meant to stay fixed, are personal protective equipment. Types A, C and D, which are fixed to the structure or need tools to install, are not, and the Commission's PPE Regulation guidelines (2023) say the same.
  • EN 17235:2024 is the standard for permanent anchor devices and safety hooks fixed on or into buildings. It is a construction product standard, cited in the EU's Official Journal from 9 February 2026, with a coexistence period to 9 August 2027 (Implementing Decision (EU) 2026/284).
  • EN 365:2004 sets what makers of fall protection equipment must say about use, maintenance and periodic examination. According to the DGUV, it requires their instructions to say periodic examination is needed at least every 12 months. It applies to fall protection PPE, not by itself to fixed anchors that are construction products.

The performance figures in EN 795 and EN 17235 are for the maker's type tests in a laboratory, not loads to apply to an installed anchor on site; any site test follows the maker's or the designer's instructions.

The UK

The Work at Height Regulations 2005 (regulation 12) ask for equipment such as anchor points to be inspected after installation and before first use, at suitable intervals where it can deteriorate, and after exceptional circumstances that could affect its safety, by a competent person, with the result kept until the next inspection. BS 7883:2019 is the code of practice for designing, installing and inspecting anchor systems. See anchor point testing for height safety and roof anchor and eyebolt testing.

Germany: inspecting anchor points (Anschlagpunkte) under the DGUV

The guidance comes from the DGUV, the umbrella body of Germany's statutory accident insurers. It is not law, but 201-056 notes that building insurers may require its maintenance intervals under their contracts.

  • How often. DGUV Information 201-056 (September 2025 edition) says the building's operator keeps permanent anchor devices safe for their whole life. The interval depends on the maker's instructions, the environment and how often they are used, and should be no more than 12 months. DGUV Regel 112-198 (2019) asks for fall protection PPE to be checked by a competent person as needed and at least every 12 months, and for the user of a fixed anchor device to check that its last inspection was no more than a year ago.
  • Who. Anchor devices fitted up to the end of 2015 count as PPE and are inspected by a competent person (Sachkundiger), sometimes with the maker's training or authorisation. Those fitted from 2016 are construction products (EN 17235), inspected and maintained to the maker's instructions by suitably qualified staff, for example trained by the maker.
  • What the inspection is. A check of the installation documents, a visual and function check to the maker's instructions, and a shake test by hand without tools, below the force that would deform the device. If anything is in doubt, the fixing is opened up. For older installations whose fixing isn't documented, the fixings of at least 30% of the anchor devices are opened up (at least three, and always the start, corner and end posts of a cable system); if the maker or the fixing method is unknown, the inspection can't go on.
  • Load tests. The DGUV's guidance doesn't ask for a load test at installation or at inspection. Its FBPSA-017 (2024) warns that load testing anchor devices already installed carries risks: if the real load path isn't understood, the test force can be too high or too low by a large factor, overload the fixings and damage the roof covering. It should be done only by people with sound expert knowledge, in agreement with the maker, to the method and test load set by the makers of the anchor device and its fixings.
  • Records. The installer's declaration of conformity and, strongly recommended, an installation record with photos; after each inspection, a report (Prüfprotokoll) of what was found, which users look at before use.

France: checking anchor points (points d'ancrage)

  • Fall-arrest PPE. The Code du travail (articles R4323-99 to R4323-101) and the arrêté of 19 March 1993 require personal fall protection systems to have had a general periodic check (vérification générale périodique) in the 12 months before they are used. The check is made by qualified people (personnes qualifiées), from inside or outside the business, and its result goes in the safety register (registre de sécurité).
  • Fixed anchors. Anchor devices fixed to the building (EN 795 types A, C and D) aren't PPE, so for them the reference is recommendation R 430 (2007) of the national health insurer's occupational risks branch (CNAM). It was adopted for the metalworking industries, INRS cites it for anchor devices generally, and it covers existing buildings without collective protection. Where an anchor is fixed into masonry, the installer tests it at 500 daN (5 kN) for 15 seconds. After that, the structural anchor gets a visual check every year and static tests at 500 daN for 15 seconds under a multi-year plan, so that the whole installation is tested in time, and again whenever needed, for example after damage or a fall. Every anchor device also gets a yearly check and maintenance to its supplier's or installer's instructions. Dates and results go in the registre de sécurité.
  • Guidance. INRS's guide to periodic checks (ED 828, 7th edition, September 2026) repeats R 430's checks for a competent person (personne compétente). AFNOR's FD S71-522 (April 2025) is a guidance document on designing, installing and checking anchor devices.

R 430 is a recommendation, not a law. 500 daN is 5 kN, about 510 kg.

The Netherlands and Belgium: inspecting anchor points (keuring ankerpunten)

  • The Netherlands. Neither the Arbobesluit nor the building rules (Bbl) name anchor points or set an interval in months for them. Dutch inspection bodies cite the Arbobesluit's article on inspecting work equipment (7.4a): equipment whose safety depends on how it is installed is inspected (gekeurd) after installation and before first use; equipment that can deteriorate is inspected as often as needed to keep it in good condition, and tested (beproefd) where necessary; and it is inspected again after exceptional events, such as an accident or a change to it. An expert (deskundige) does it, and written proof is kept at the workplace. The yearly inspection Dutch firms commonly offer follows EN 365 and the makers' instructions, not Dutch law. The building rules for new buildings (Bbl, articles 4.240 and 4.241) ask for enough building-fixed safety provisions where maintenance can't otherwise be done safely, but set no periodic inspection. The construction sector's guidance (Volandis A-blad Hellende daken) puts the anchor point's quality on the building owner, who must show the employer it is reliable.
  • Belgium. The labour ministry (FOD WASO) treats fixed anchor points as part of the fall protection PPE. Permanently fixed fall protection PPE is examined by an external technical inspection service (EDTC) approved for lifting equipment each time it has held a fall; fall protection PPE that isn't permanently fixed, at least every 12 months and after a fall.

Italy: inspecting roof anchor systems (linee vita)

  • National law. D.Lgs. 81/2008 asks for fall protection PPE to be attached to a secure anchor point (article 115, as rewritten from 31 December 2025), and for PPE to be maintained, repaired and replaced as its maker says (article 77). It sets no inspection interval and no load test for anchor points.
  • Regional rules. Several regions have their own rules for roof anchor systems, and they differ. In Tuscany (DPGR 75/R of 2013) the roof's technical file (elaborato tecnico della copertura) includes a calculation of the fixing by a professional qualified in structural design, the maker's certification, the installer's declaration of correct installation and a maintenance programme, and the owner keeps a register of checks (registro di controllo) up to date. Piedmont (DPGR 6/R of 2016) has a model inspection and maintenance register (registro di ispezione e manutenzione) for each use, periodic and extraordinary inspection, with the interval set by the installer. Where a fascicolo dell'opera is required, the roof file forms part of it.
  • Standards. UNI 11560:2022 covers choosing, installing, using, inspecting and maintaining permanent roof anchor systems. UNI 11578:2015 was withdrawn on 30 June 2026 and replaced by UNI EN 17235:2024.
  • Collaudo. "Collaudo linea vita" is the trade's name for the acceptance check of a new system. None of the official texts we read asks for a load test with a dynamometer, or gives a test load: follow the maker's manual and the designer.

Brazil: NR 35 and building anchors (ancoragem predial)

  • NR 35 (work at height), Annex II. Anchorage systems are installed by trained workers (trabalhadores capacitados) and inspected after installation, alteration or relocation, then periodically at no more than 12 months, following the system's project, the maker's instructions and the applicable standards. Inspections are recorded. A permanent anchorage system needs a project, and its installation is the responsibility of a legally qualified professional (profissional legalmente habilitado), registered with their professional council.
  • Load tests. NR 35 sets no periodic load test. It asks for tests (ensaios), under a legally qualified professional, only of an existing anchor whose markings can't be recovered, which is then marked again.
  • Building anchors (NR 18, item 18.12.12). Buildings 12 m or more tall have anchor devices around their whole perimeter for façade cleaning, maintenance and restoration, each for a working load of at least 1,500 kgf (14.7 kN), shown in the building's structural design. Tests to prove that load follow Brazil's national standards or, without one, the maker. 1,500 kgf is a working load, not a test load.
  • Records. Engineering work, such as an anchorage project, its installation or a test report, carries an ART (Anotação de Responsabilidade Técnica) under Lei 6.496/1977.

When should an anchor point be load tested?

When a rule, the system's designer or the anchor's maker asks for it, at the load and hold time they set: for example R 430's 500 daN for 15 seconds in France, or the designer's proof load in the UK. In Germany the DGUV leaves load tests to the makers' method and load. Never go above the load the maker allows: a test can damage the fixing it is meant to check.

A tester for anchor points should cover the test load and apply it in the direction and by the method the anchor's maker or the designer sets. A current calibration certificate shows the reading can be trusted; the rules above don't ask for a particular make of tester. The Staht t25 tests to 25 kN (5,620 lbf), with a clevis for eyes and a jaw and washers for studs, shows live and peak load together, and comes with a UKAS traceable calibration certificate. Each result can be recorded in the free Staht Connect app with a photo and a map pin. For loads in daN, kg or lbf, use the force converter.

What should the inspection record show?

Each country has its own name for it: Prüfprotokoll in Germany, the registre de sécurité in France, written proof (schriftelijke bewijsstukken) in the Netherlands, the registro di controllo (Tuscany) or registro di ispezione e manutenzione (Piedmont) in Italy, and the inspection record in Brazil, with an ART where engineering work such as a project or a test report is involved. Whatever its name, keep for each anchor: its reference and place on the roof plan, what it is and what it is fixed into, what was checked and found, any load applied and how long it was held, the result and photos. For the visit: the date, who inspected, and the tester's make, serial number and calibration date. Our free proof load test record covers the load tests; record the base material, the inspection findings and photos alongside it, or in the Staht Connect app.

Testing an anchor on a roof

A Staht t25 on an anchor in a stone pier. Clip the tester and the spanner to their lanyards before working at height.

A tester in a safety helmet and high-visibility vest using a Staht t25 on an anchor in a stone pier on a roof

Questions

Sources

  1. PPE Regulation (EU) 2016/425 Guidelines, 2nd edition, April 2023, European Commission (copy hosted by EUROGIP)
  2. Commission Implementing Decision (EU) 2015/2181 on EN 795:2012, EUR-Lex
  3. Commission Implementing Decision (EU) 2026/284 (harmonised standards for construction products, EN 17235:2024), EUR-Lex
  4. NF EN 795 Équipement de protection individuelle contre les chutes: dispositifs d'ancrage (March 2016, EN 795:2012), AFNOR
  5. Personal fall protection equipment: anchor devices; German version FprEN 795:2026 (project), DIN
  6. FAQ PSA gegen Absturz (EN 365 periodic examination), DGUV
  7. The Work at Height Regulations 2005, regulation 12: Inspection of work equipment, legislation.gov.uk
  8. DGUV Information 201-056 Schutzmaßnahmen gegen Absturz auf Dächern (September 2025), DGUV
  9. DGUV Regel 112-198 Benutzung von persönlichen Schutzausrüstungen gegen Absturz (September 2019), DGUV
  10. Fachbereich AKTUELL FBPSA-017 Anschlageinrichtungen und -möglichkeiten für PSA gegen Absturz (15 July 2024), DGUV
  11. Code du travail, article R4323-101, Code du travail numérique, Ministère du Travail
  12. Code du travail, article R4323-100, Code du travail numérique, Ministère du Travail
  13. Arrêté du 19 mars 1993, article 1 (PPE subject to periodic checks), OPPBTP
  14. Recommandation R 430 Dispositifs d'ancrage pour les équipements de protection individuelle contre les chutes de hauteur, Assurance Maladie (CNAM)
  15. ED 828 Principales vérifications périodiques (7th edition, September 2026), INRS
  16. FD S71-522 Guide pour l'installation de dispositifs d'ancrage: étude, pose et vérification (April 2025), AFNOR
  17. Arbeidsomstandighedenbesluit, article 7.4a Keuringen, wetten.overheid.nl
  18. Besluit bouwwerken leefomgeving, articles 4.240 and 4.241, wetten.overheid.nl
  19. A-blad Hellende daken, Volandis
  20. Persoonlijke beschermingsmiddelen, FOD Werkgelegenheid, Arbeid en Sociaal Overleg
  21. D.Lgs. 9 aprile 2008 n. 81, article 115, Normattiva
  22. D.Lgs. 9 aprile 2008 n. 81, article 77, Normattiva
  23. DPGR 18 dicembre 2013 n. 75/R (Toscana), Regione Toscana
  24. DPGR 23 maggio 2016 n. 6/R (Piemonte), Regione Piemonte
  25. UNI 11560:2022 Sistemi di ancoraggio permanenti in copertura, UNI
  26. UNI 11578:2015 (withdrawn 30 June 2026), UNI
  27. NR-35 Trabalho em Altura, Anexo II Sistemas de Ancoragem, Ministério do Trabalho e Emprego
  28. NR-18, item 18.12.12 (ancoragem), Ministério do Trabalho e Emprego
  29. Lei nº 6.496, de 7 de dezembro de 1977 (ART), Câmara dos Deputados
  30. BS 7883:2019 Personal fall protection equipment. Anchor systems. System design, installation and inspection. Code of practice, BSI

Test anchor points to 25 kN