Guide: Australia

Anchor proof testing in Australia

Em resumo

The main Australian guidance on site testing post-installed anchors is the Australian Engineered Fasteners and Anchors Council's Technical Note TN05. A proof test loads an installed anchor to a load the responsible engineer sets and holds it for at least 30 seconds, on at least 3 anchors or 2.5% of them. Queensland's scaffolding code has every chemical anchor for a scaffold tie proof tested.

Esta página explica como as ancoragens, os olhais e os pontos de ancoragem são habitualmente ensaiados, inspecionados e registados. Não substitui a lei, as normas que refere, as instruções do fabricante nem as decisões da pessoa responsável pela obra ou pelo sistema, que define os ensaios, as cargas e o regime de inspeção. Um ensaio regista o que aconteceu no dia; não aprova uma ancoragem para utilização.

Key figures

Proof loadSet by the responsible engineer; no more than the anchor's design capacity, and no more than 0.7 × the steel's yield (AEFAC TN05)
HoldAt least 30 seconds, with the load dropping no more than 10%
How manyAt least 3 anchors or 2.5%, whichever is more; 100% may be required for fall arrest
GaugeAccurate to ±5% of the reading, calibrated at least every year
Queensland scaffold tiesEvery chemical anchor proof tested to 100% of its design load, and recorded

What is it called in Australia?

Engineers and builders say site testing, proof test (to check an anchor was installed properly) and ultimate test (to failure, to find what the base material will hold). Contractors and sellers say pull test, pull-out test, anchor bolt testing and chemical anchor testing. The kit is a pull tester or proof load tester, and the person is the tester, working to the responsible engineer.

When do post-installed anchors need site testing?

Often they don't. AEFAC's TN05 says site testing is generally not needed where the base material is known, the anchor has design data for it, and a competent installer fits it under supervision. Anchors in concrete are designed to AS 5216, now in its 2026 edition. WorkSafe Victoria treats anchorages for fall arrest systems as structural: the anchors should be specified by a qualified structural design engineer or other suitably skilled person, and tested, inspected and maintained as the maker specifies.

Tests are called for when something is uncertain: the base material, the installation, or an anchor used outside its data. That's when the specifier or responsible engineer asks for proof tests on a sample, or ultimate tests before the job.

TN05 is built on the UK's BS 8539:2012 and Construction Fixings Association guidance, so our BS 8539 proof testing guide and preliminary tests guide use the same ideas, with UK figures.

AEFAC TN05 proof tests at a glance

PointWhat TN05 recommends
PurposeCheck that an installed anchor was installed properly
Proof loadSet by the responsible engineer for the project. No more than the anchor's design (ULS) capacity, or 1.5 × the allowable working load for anchors rated by working load, and in either case no more than 0.7 × the steel's yield
HoldAt least 30 seconds; the load shouldn't fall by more than 10% in that time
SampleAt least 3 anchors or 2.5% of the anchors of that kind, whichever is more
After failuresOne failure: 6 anchors or 5%. Two or more: test every anchor of that kind
Fall arrestStandards and codes may require every anchor to be proof tested
GaugeAccurate to ±5% of the reading, showing the highest load reached, calibrated at least every year and after a drop or repair, on a precision machine such as a NATA-certified one
ReportAmong other things: the tester's name and qualifications, the make, type and capacity of the tester, and its last calibration date

TN05 comes in four volumes: general, proof tests, ultimate tests, and testing in masonry. The figures here are from volumes 1 and 2 (version 1.1, January 2020). For testing in brick and block, see also pull testing anchors in masonry.

Do scaffold tie anchors need testing?

  • Queensland: the Scaffolding Code of Practice 2021 says every chemical anchor installed for scaffold ties is to be individually proof tested to 100% of its design load, and the tests documented, with installation records kept on site. It wants horizontal tie anchors with a working load limit of at least 6 kN from their supplier, and prefers cast-in anchors or through-bolts to post-installed anchors for ties.
  • New South Wales: SafeWork NSW's Scaffolding Industry Safety Standard (2022) has the scaffold installation designer set the tie design, anchor type included, and says proof testing of tie anchorages may also be needed.
  • Both point to the scaffolding standard AS/NZS 1576.1; Queensland's code refers to its Appendix E for anchors.

We found no Australian regulator guidance on tie anchor testing as detailed as the UK's NASC TG4:25 (see scaffold tie proof testing). Outside Queensland's rule for chemical anchors, whether tie anchors are proof tested, to what load and how many, is for the scaffold installation designer or the engineer to specify.

Which Staht tester?

Against TN05's ±5% of reading: the t25 and t60 load cells are accurate to ±1.5% of full scale, ±0.375 kN and ±0.9 kN. That is within 5% of the reading from 7.5 kN up on the t25 and from 18 kN up on the t60. Below that, the full-scale figure is more than 5% of the reading (6.3% at 6 kN on the t25), so ask us or your dealer for the tester's calibration results at your proof load before you use it for TN05 work. The screen holds the peak load, and the free Staht Connect app records each test with a photo, a map pin and the time.

In Australia, Staht kits are sold, serviced and calibrated by Iccons (Dandenong South, Victoria) and Sky5 (Rosebery, NSW): see where to buy. Height safety anchors are covered in anchor point testing in Australia.

More questions

Sources

  1. Technical Note TN05: Site Testing Guidelines, Vol 1 General (Ver. 1.1, January 2020), AEFAC
  2. Technical Note TN05: Site Testing Guidelines, Vol 2 Proof tests (Ver. 1.1, January 2020), AEFAC
  3. AS 5216:2026 Design of post-installed and cast-in fastenings in concrete, Intertek Inform (Standards Australia distributor)
  4. Scaffolding Code of Practice 2021, WorkSafe Queensland
  5. Scaffolding Industry Safety Standard, SafeWork NSW
  6. Post installed anchors, WorkSafe Victoria

Proof test anchors to 25 or 60 kN

The t25 and t60 with peak hold and the free Staht Connect app.