Με λίγα λόγια

This calculator works out a BS 8539 preliminary test load: Ntest = NEk × νtest ÷ (αdist × Ω). Below it, the method is set out in words, with the proof load: Np = NEk × 1.5 where at least 2.5% of anchors are tested, or × 1.25 where at least 5% are, up to 1.5 × N_rec.

Ο παρών οδηγός εξηγεί πώς σχεδιάζονται και εκτελούνται οι δοκιμές επί τόπου σύμφωνα με το BS 8539:2012+A1:2021. Δεν αντικαθιστά το πρότυπο, τα στοιχεία του κατασκευαστή του αγκυρίου ή τις οδηγίες του μελετητή ή του μηχανικού που είναι υπεύθυνος για το έργο, ο οποίος καθορίζει το πρόγραμμα δοκιμών, τα φορτία και τους συντελεστές. Μια δοκιμή καταγράφει ό,τι συνέβη τη συγκεκριμένη ημέρα· δεν εγκρίνει μια στερέωση για χρήση.

Preliminary tests

Anchor test load calculator

The unfactored tensile load on one anchor, also called the applied load. It comes from the specifier, the client or whoever asks for the test.

What the anchor is fixed into. Stone, brick and block are masonry.

Long-term loading is for general purposes; short-term loading is for uses such as scaffold or steeplejack anchoring. The specifier or engineer confirms which applies.

Nylon anchors take higher test load factors because they creep.

Choose the condition that applies. If more than one condition applies, the specifier gives the Ω to use: choose Other and enter it below. The specifier or engineer decides.

Used only when the condition is Other: the Ω the specifier gives, such as where more than one condition applies.

Point supports may be measured centre to centre; any other support by the clear width. For a symmetrical tester, a_dist = 2 × L. Staht bridges: 127 mm (t25 and t60, L = 63.5 mm), 375 mm and 575 mm, the clear distance between the feet along the bridge (Staht datasheets), which errs on the safe side. For a preliminary test in concrete, L must be more than h_ef.

The depth to the anchor's lowest point of engagement in the base material, from the specifier or engineer. For a nylon anchor, take half its nominal embedment depth, h_nom.

Αποτελέσματα

Test load factor ν_test4,0From the base material, loading and anchor: 5 or 3.5 for nylon; otherwise 3 or 2 in concrete and 4 or 3 in masonry, for long-term or short-term loading.
Condition factor Ω0,800From the condition chosen, or the specifier's value for Other.
Support spacing for no reduction, min(3 × h_ef; 450 mm)135,0 mmWith a_dist at least this, α_dist = 1. Equation B.12 stops at h_ef = 150 mm. Deeper than that, this calculator gives α_dist = 1 only where a_dist is at least 3 × h_ef (L at least 1.5 × h_ef, the concrete rule); otherwise it shows the result is outside the method, and the engineer decides.
Reduction factor α_dist0,9641 when a_dist is at least min(3 × h_ef; 450 mm), and, deeper than h_ef = 150 mm, in this calculator only where a_dist is at least 3 × h_ef. Otherwise 0.4 + a_dist ÷ (5 × h_ef), equation B.12, for a_dist more than 1.5 × h_ef and h_ef up to 150 mm.
Test load N_test3,89 kNN_Ek × ν_test ÷ (α_dist × Ω), equation B.4. Test five anchors, installed only for the test, to this load.

The result is only as good as what goes in. The specifier or engineer responsible for the application confirms the characteristic action, the factors and the test method before any test.

This calculator follows BS 8539's preliminary test approach. It doesn't apply to proof tests, and it doesn't replace the standard or the anchor manufacturer's data.

The figures shown when the page opens are an example: 0.75 kN on an anchor other than nylon in stonework, under long-term loading at a high service temperature, with 45 mm effective embedment and the 127 mm support spacing of a Staht t25 standard bridge.

How is a BS 8539 test load worked out?

A preliminary test load is NEk × νtest ÷ (αdist × Ω); a proof load is NEk × 1.5 or 1.25, depending on the sample. The calculator does the first; the second is simple enough to do by hand. Both follow BS 8539:2012+A1:2021, Annex B.

Preliminary test (Annex B.2.3.1):

  1. Take the characteristic action N_Ek from the specifier.
  2. Find the test load factor ν_test from the base material, the loading and the anchor: 5 or 3.5 for a nylon anchor; otherwise 3 or 2 in concrete and 4 or 3 in masonry, for long-term or short-term loading.
  3. Work out the reduction factor αdist from the bridge's support spacing adist and the effective embedment depth hef. If adist is at least 3 × hef, αdist = 1.0. Otherwise, for hef up to 150 mm and adist more than 1.5 × hef, αdist = 0.4 + adist ÷ (5 × hef). Deeper than 150 mm there is no formula: the calculator gives 1.0 only where adist is at least 3 × hef, and otherwise shows the result is outside this method, for the engineer to decide. If adist is 1.5 × hef or less, use a wider bridge. In concrete, a preliminary test also needs the closest support more than 1.0 × hef from the anchor (adist ÷ 2 for a bridge centred on it); if it is not, use a wider bridge. Staht's figures, 127 mm for the t25 and t60 standard bridges and 375 mm and 575 mm for the wider bridges, are the clear distance between the feet along the bridge (Staht datasheets), the basis the industry's published bridge table uses. That errs on the safe side: the feet of a four-leg bridge actually sit further from the anchor, so the clear spacing gives a slightly higher test load, never a lower one.
  4. Take the condition factor Ω from the specifier, as a single value for the case: one of the listed conditions, or, where more than one applies, the value the specifier gives.
  5. Ntest = NEk × νtest ÷ (αdist × Ω). Test 5 anchors, installed only for the test, to this load.

Proof test (Annex B.3):

  1. Take N_Ek from the specifier.
  2. Choose the proof factor with the engineer responsible: 1.5 where at least 2.5% (but less than 5%) of the anchors are tested, or 1.25 where at least 5% are.
  3. Np = NEk × ν_P,test.
  4. Check Np is no more than 1.5 × Nrec, the manufacturer's recommended resistance in that base material, allowing for any spacing or edge distance reductions.
  5. Work out the sample: the percentage of all anchors, rounded up, and at least 3 in each discrete area.

What does each input mean, and who supplies it?

InputWhat it meansWho supplies it
Characteristic action N_EkThe unfactored tensile load on one anchor, also called the applied loadThe specifier, the client or whoever asks for the test
Base materialConcrete or masonry; stone, brick and block count as masonryThe specifier, checked on site
LoadingLong-term, for general purposes, or short-term, such as scaffold or steeplejack anchoringThe specifier or engineer
AnchorNylon, or any other anchor; nylon takes higher factors because it creepsThe anchor's data
Condition of the application, for the condition factor ΩOne choice: none (1.0), sustained tension (0.9), wet in use but tested dry (0.8), hotter than the maker's range (0.8), rendered or plastered wall (0.75), cracked concrete (0.7), or OtherThe specifier or engineer
Condition factor Ω from the specifierUsed only with Other, for example where more than one condition appliesThe specifier
Support spacing a_distTo the axis of point supports, or the clear width between continuous ones; 2 × L for a bridge centred on the anchor. Staht's figures are the clear spacing between the feet along the bridge, which errs on the safe sideThe tester, from the bridge used
Effective embedment depth h_efDepth to the lowest point where the anchor grips; for nylon anchors, half the nominal embedment h_nomThe specifier or engineer

What does the calculator show?

The calculator shows each factor it used, then the test load:

  • Test load factor ν_test, from the base material, loading and anchor you chose.
  • Condition factor Ω, from the condition you chose, or the specifier's value for Other.
  • Support spacing for no reduction, the smaller of 3 × h_ef and 450 mm.
  • Reduction factor α_dist, worked out exactly from equation B.12, so a result can differ by 0.01 kN from one worked by hand with α_dist rounded.
  • Test load N_test, NEk × νtest ÷ (α_dist × Ω): load 5 anchors, installed only for the test, to it.

It gives no test load, and shows a warning instead, in three cases:

  • In concrete, the nearest support is too close: L (adist ÷ 2) is 1.0 × hef or less. Use a bridge with wider support spacing.
  • The support spacing is outside this method: in masonry, adist is 1.5 × hef or less. Use a wider bridge, or ask the engineer how to test.
  • The embedment and support spacing are outside this method: hef is over 150 mm and adist is under 3 × h_ef. Equation B.12 does not apply there, and the engineer decides.

For proof loads, use the steps above; the calculator covers preliminary tests only.

Worked example 1: a preliminary test in stonework

A bonded anchor in stonework carries a long-term load. The specifier gives NEk = 0.75 kN and hef = 45 mm. The anchor will see temperatures above the manufacturer's normal service range, and the test is at normal temperature, so the specifier gives a single Ω of 0.8 for this case, having taken the long-term loading into account. νtest for a non-nylon anchor in masonry under long-term loading is 4. The test uses the Staht t25 standard bridge, with a support spacing adist = 127 mm, the clear distance between the feet along the bridge (Staht datasheet). These are the figures the calculator opens with.

  • 3 × hef = 135 mm, more than 127 mm, so αdist applies. 127 mm is more than 1.5 × h_ef (67.5 mm), so equation B.12 holds.
  • α_dist = 0.4 + 127 ÷ (5 × 45) = 0.4 + 0.564 = 0.964.
  • N_test = 0.75 × 4 ÷ (0.964 × 0.8) = 3.0 ÷ 0.771 = 3.89 kN.

With a Staht Bridge 375-25, αdist = 1.0 and Ntest = 3.0 ÷ 0.8 = 3.75 kN.

Worked example 2: a proof test on 300 anchors

300 anchors are installed in one area of concrete. The specifier gives NEk = 4.2 kN, and the manufacturer's recommended resistance Nrec = 4.5 kN.

  • 2.5% sample: N_p = 4.2 × 1.5 = 6.3 kN. The limit is 1.5 × 4.5 = 6.75 kN, so 6.3 kN is allowed. 2.5% of 300 is 7.5, so test 8 anchors.
  • 5% sample: N_p = 4.2 × 1.25 = 5.25 kN. 5% of 300 is 15, so test 15 anchors.

The engineer responsible for the specification chooses between them.

Does the calculator cover scaffold ties?

Scaffold ties tested under NASC TG4:25 use simpler multiples of the tie duty: 2 × for preliminary tests (3 × for nylon anchors) and 1.25 × for proof tests. See scaffold tie test loads.

More questions

Πηγές

  1. BS 8539:2012+A1:2021 Code of practice for the selection and installation of post-installed anchors in concrete and masonry, Annex B (equations B.4, B.11 and B.12), BSI
  2. NASC TG4:25 Anchorage systems for scaffolding, Sections 9.2 and 9.6, NASC

Bridges that keep α_dist at 1.0

Staht's 375 mm and 575 mm bridges suit deeper anchors.